Bills › 91st General Assembly
Relating to the siting and operation of renewable electric power generating facilities
Topics:Business & economyEnergy & utilitiesProperty taxesWind & solar
Same legislation: HF 2580
Where it is now
- Done: IntroducedFebruary 5, 2026
- Done: SubcommitteeFebruary 5, 2026
- Done: House committeeFebruary 16, 2026
- Next: Passes the House
- Next: Senate committeeFunnel: by March 20, 2026
- Next: Passes the Senate
- Next: To the Governor
- Next: Signed into law
Became HF 2580 → Its progress continues under the new number. Go to HF 2580 What’s a funnel?
What’s in it
This bill relates to siting and operation of certain renewable electric power generation facilities. The bill prohibits exercising the power of eminent domain for acquiring right-of-way for, constructing, or operating any renewable electric power generation facility (facility). The bill creates standard-making ability for local authorities approving a facility proposed after January 1, 2026. _____ The bill sets guidelines for a local authority to implement a facility setback standard, which shall include a facility’s distance from specified existing buildings based on the facility’s height.
Read the full explanation
The local authority must include a process for an owner of an abutting dwelling, nonparticipating property, or community building to waive the setback standards. The bill includes additional standards a local authority may implement including shadow flicker standards, sound limitations, a requirement that an applicant for a proposed facility shall agree to repair any damages caused by the facility, wind turbine height limitations, electric code and building code standards, fire protection standards, fencing limitations, ground cover standards, and solar energy conversion facility panel height requirements. The bill requires a local authority to utilize reasonable estimates for application approval costs and prohibits the local authority from requiring the facility owner to pay for administration or road work that is not directly attributable to the approval and construction of the facility. A local authority shall not prohibit or regulate a facility testing the suitability of a facility placement. Any regulations enacted after the application for a facility permit shall not limit the construction, operation, or maintenance of that facility. A local authority shall not prohibit an affected landowner or other entity from waiving requirements by conveyance of an easement. The bill provides that a local authority may require a facility that is not owned or operated by a public utility regulated by the Iowa utilities commission to file a decommissioning plan including certain measures. The local authority is prohibited from requiring a facility to provide a revision or amendment of a decommissioning plan. _____ that is currently operating or has applied for certification before the enactment of the bill, or the repowering of a facility existing on or before January 1, 2026, subject to certain conditions. The bill allows a local authority to place one temporary moratorium for up to six months on the installation of a wind energy conversion facility for the purpose of adopting new regulations that are consistent with the bill. The bill provides that all new, revised, or amended ordinances or regulations pertaining to solar or solar energy conversion facilities shall only be prospectively applied. The bill authorizes a local authority to waive any requirement for renewable electric power generation under the bill if the local authority complies with additional requirements established in the bill. The bill provides that if, on the effective date of the bill, a local authority has in effect a moratorium on renewable electric power generation or has adopted standards that do not comply with standards in the bill, the local authority must complete specified actions by January 1, 2028. The bill further provides that a local authority that enacts a renewable electric power generation moratorium or adopts noncompliant standards must complete the same actions prior to enactment of the moratorium or standards. The bill requires the local authority to provide notice to all persons within its jurisdiction who are required to pay property tax to the local authority. The notice must include an estimate of the amount of property tax revenue not received by the local authority as a result of the moratorium or noncompliance with standards in the bill. _____ and to determine the amount of property tax revenue generated annually by facilities in that comparable jurisdiction. The bill also requires the local authority to hold a public hearing to discuss the reasons for the renewable electric power generation moratorium or noncompliant standards. The public hearing must include a demonstration that the moratorium or noncompliant standards are necessary to prevent an adverse impact on the health or safety of the local authority’s residents or public facilities. The bill expounds that a local authority is not required to adopt standards for approval of renewable electric power generation facilities; however, a local authority with existing siting standards in effect on or after the effective date of the bill that do not comply with the bill must amend the standards to comply with the bill by December 31, 2026, or follow the noncompliance procedures described in the bill.
From the explanation printed with the bill as introduced, written by the Legislative Services Agency. Amendments adopted later aren’t reflected. Full bill text
House subcommittee
Named February 5, 2026. On February 11, 2026 it recommended passage.
Three legislators hear a bill first and recommend what the committee should do; it’s the best time to weigh in. How to take part
Iowa Code it changes
Creates§476.53B
Amends§6A.22
Read from the bill as introduced. Each links to every bill touching that chapter of the Iowa Code. How the Code works
Lobbying
9 for · 3 against · 22 undecided · Who →
Family tree
Where this legislation came from and where it went: earlier tries, the versions it moved through this Assembly, and later bills built on it.
Study bill
91st General Assembly
Earlier and later bills are matched by wording or an identical title; check the text to be sure it’s the same idea.
Similar bills
- HSB 317 Relating to the siting and operation of renewable electric power generating facilities91st General Assembly · Subcommittee recommends passageSimilar
- HF 2257 Relating to the siting and operation of renewable electric power generating facilities, an…91st General Assembly · In committeeSimilar
Matched by the wording of each bill’s explanation, or an identical title. Companion bills and renumbered versions of this bill aren’t listed; they’re the same bill.