Proyectos de ley › 91.ª Asamblea General
Relating to grid-enhancing technologies and reconductoring, including study and reporting requirements
Presentado por Rep. Charley Thomson (R)
Temas:Energy & utilities
La misma legislación: HF 2682
Dónde está ahora
- Hecho: Presentado5 de febrero de 2026
- Hecho: Subcomité9 de febrero de 2026
- Hecho: Comité de la Cámara18 de febrero de 2026
- Se saltó: Lo aprueba la CámaraSigue como HF 2682
- Sigue: Comité del Senado
- Sigue: Lo aprueba el Senado
- Sigue: A gobernador(a)
- Sigue: Firmado como ley
Ahora es HF 2682 → Sigue avanzando con el número nuevo. Ir a HF 2682 ¿Qué es el embudo (funnel)?
Qué contiene
Resumen con IA Electric companies that own power lines in Iowa must study how to use new technologies to improve the electrical grid. Every three years, these companies will submit a report to the state showing how they can increase power capacity, reduce congestion, and make the system more reliable. This rule does not apply to small local cooperatives or municipal utilities. (Todavía no está traducido al español.)1
Lea la explicación oficial (en inglés)
This bill relates to grid-enhancing technologies and reconductoring. The bill defines terms related to electric transmission capacity, congestion, and grid-enhancing technologies. The bill requires each public utility or transmission company that owns or operates electric transmission lines in Iowa to prepare and submit by January 1, 2027, and every three years thereafter, a public study to the Iowa utilities commission (commission) examining the feasibility of projects using grid-enhancing technologies and identifying reconductoring opportunities. The bill requires the study to provide information on feasibility, costs, implementation time, and other information deemed relevant by the commission. The study must be designed to identify projects that can achieve one or more specified purposes, including increasing transmission capacity, reducing congestion, reducing curtailment of renewable and zero-carbon resources, improving reliability, reducing siting conflicts, increasing flexibility to reduce risks surrounding technology, reducing line losses, increasing flexibility in transmission planning, and improving the ability to serve new customers or increased customer load. The bill does not apply to a municipal utility, a cooperative electric association, or a company or organization that owns a transmission line that serves a single customer or interconnects a single electric generating facility. The bill allows public utilities and electric transmission line companies to rely on existing analyses and information developed by a regional transmission organization or its subgroups to satisfy the study requirements and to include that information as necessary.
House subcommittee
Named February 9, 2026. On February 17, 2026 it recommended passage.
Three legislators hear a bill first and recommend what the committee should do; it’s the best time to weigh in. How to take part
1 comentario público por escrito a su subcomité: 17 de febrero de 2026 (1) · en el sitio de la Legislatura
Lo que cambia del Código de Iowa (Iowa Code)
Crea§478.34
Cabildeo
10 a favor · 0 en contra · 11 indecisos · Quiénes →