Proyectos de ley › 91.ª Asamblea General

Relating to the siting and operation of renewable electric power generating facilities

Presentado por Sen. Mike Klimesh (R)

Temas:Energy & utilitiesCities & countiesWind & solar

La misma legislación: HSB 317, SF 2447

Dónde está ahora

  1. Hecho: Presentado19 de febrero de 2025
  2. Hecho: Subcomité26 de febrero de 2025
  3. Hecho: Comité del Senado23 de febrero de 2026
  4. Se saltó: Lo aprueba el SenadoSigue como SF 2447
  5. Sigue: Comité de la Cámara
  6. Sigue: Lo aprueba la Cámara
  7. Sigue: A gobernador(a)
  8. Sigue: Firmado como ley

Ahora es SF 2447 → Sigue avanzando con el número nuevo. Ir a SF 2447 ¿Qué es el embudo (funnel)?

Qué contiene

Resumen con IA Local governments will gain new powers to set rules for renewable energy projects, like wind and solar farms, proposed after January 1, 2025. These rules can include requirements for how far equipment must be from buildings, noise limits, and plans for removing equipment when it is no longer used. The law also prevents cities and counties from banning these projects based on certain land types or setting limits on the total amount of land used for energy. (Todavía no está traducido al español.)1

Lea la explicación oficial (en inglés)

This bill relates to siting and operation of certain renewable electric power generation facilities. The bill creates standard-making ability for local authorities approving a renewable electric power generation facility (facility) proposed after January 1, 2025. The bill sets guidelines for a local authority to implement a facility setback standard, which shall include a facility’s distance from specified existing buildings based on the facility’s height. The local authority must include a process for an owner of an abutting dwelling, nonparticipating property, or community building to waive the setback standards. The bill includes additional standards a local authority may implement including shadow flicker standards, sound limitations, a requirement that an applicant for a proposed facility shall agree to repair any damages caused by the facility, wind turbine height limitations, electric code and building code standards, fire protection standards, fencing limitations, ground cover standards, and solar energy conversion facility panel height requirements. The bill requires a local authority to utilize reasonable estimates for application approval costs and prohibits the local authority from requiring the facility owner to pay for administration or road work that is not directly attributable to the approval and construction of the facility. A local authority shall not prohibit or regulate a facility testing the suitability of a facility placement. Any regulations enacted after the application for a facility permit shall not limit the construction, operation, or maintenance of that facility. A local authority shall not prohibit an affected landowner or other entity from waiving requirements by conveyance of an easement. The bill provides that a local authority may require a facility that is not owned or operated by a public utility regulated by the Iowa utilities commission to file a decommissioning plan including certain measures. The local authority is prohibited from requiring a facility to provide a revision or amendment of a decommissioning plan. The bill requires a facility to be presumed abandoned if the facility has not been in operation for 24 months, with some exceptions. The owner of the abandoned facility is responsible for removing the facility and is subject to any other reasonable conditions in the decommissioning plan if applicable. The bill shall not apply to a wind energy conversion facility with a nameplate capacity of 25 or more megawatts and that has applied for certification under Code chapter 476A, a facility that is currently operating or has applied for certification before the enactment of the bill, or the repowering of a facility existing on or before January 1, 2025, subject to certain conditions. The bill requires a local authority to approve a request by a facility if the request is in compliance with the bill. A local authority shall issue a decision on a request by a facility within 120 days of the request submission. The denial of a request shall be supported by substantial evidence of noncompliance by the facility. The bill prohibits a local authority from disallowing the development of a facility in an agricultural or industrial district. The bill provides that a local authority may not prohibit or otherwise limit renewable electric power generation facility development based on corn suitability rating as calculated using the methodology recognized by the Iowa state university of science and technology. The bill prohibits a local authority from limiting the size of any specific project or creating caps on projects based on total land mass within the local jurisdiction. The bill allows a local authority to place one temporary moratorium for up to six months on the installation of a wind energy conversion facility for the purpose of adopting new regulations that are consistent with the bill. The bill provides that all new, revised, or amended ordinances or regulations pertaining to solar or solar energy conversion facilities shall only be prospectively applied. The bill expounds that a local authority is not required to adopt standards for approval of renewable electric power generation facilities; however, a local authority with existing siting standards in effect on or after the effective date of the bill that do not comply with the bill must amend the standards to comply with the bill by December 31, 2025.

Por qué importa. Local authorities would gain the ability to set specific standards for renewable electric power generation facilities proposed after January 1, 2025, including rules for setbacks, noise, and shadow flicker. Facility owners would be required to follow these local guidelines and may need to provide decommissioning plans, while certain landowners could waive these standards through easements. Local governments must also follow specific rules regarding application approval costs, decision timelines, and prohibitions on limiting projects based on land mass or corn suitability. (Todavía no está traducido al español.)2

Texto completo del proyecto (en inglés)3

Senate subcommittee

Named February 26, 2025. On March 4, 2025 it recommended passage.

Three legislators hear a bill first and recommend what the committee should do; it’s the best time to weigh in. How to take part

101 comentarios públicos por escrito a su subcomité: 20 de marzo de 2025 (2), 4 de marzo de 2025 (99) · en el sitio de la Legislatura

Lo que cambia del Código de Iowa (Iowa Code)

Modifica§476.53A

Cómo funciona el Código4

Cabildeo

10 a favor · 3 en contra · 32 indecisos · Quiénes →

Family tree

Tried before

This idea has been filed in an earlier General Assembly. None got through a chamber.

  • SSB 3169 SSB 3169
    90th General Assembly · Subcommittee recommends passage · similar
    Cleared committee

Similar bills this General Assembly

  • HF 2257 Relating to the siting and operation of renewable electric power generating facilities, an…
    91st General Assembly · In committee
    Nearly identical
  • HF 2580 Relating to the siting and operation of renewable electric power generating facilities
    91st General Assembly · Approved by committee
    Similar

Matched by wording or an identical title.