Proyectos de ley › 90.ª Asamblea General

SF 455Firmado por gobernador(a) · 10 de abril de 2024

Relating to the regulation of topsoil and storm water at construction sites

Presentado por el comité Local Government del Senado

Temas:Environment & natural resourcesCities & counties

La misma legislación: SF 34

Dónde está ahora

  1. Hecho: Presentado10 de enero de 2023
  2. Hecho: Subcomité11 de enero de 2023
  3. Hecho: Comité del Senado28 de febrero de 2023
  4. Hecho: Lo aprueba el Senado15 de marzo de 202333–15
  5. Hecho: Comité de la Cámara29 de marzo de 2023
  6. Hecho: Lo aprueba la Cámara11 de marzo de 202453–46
  7. Hecho: A gobernador(a)10 de abril de 2024
  8. Hecho: Firmado como ley10 de abril de 2024

Firmado como ley ¿Qué es el embudo (funnel)?

Qué contiene

Resumen con IA Local governments would no longer be allowed to make rules about how topsoil is handled or placed at construction sites. Cities and counties can still regulate storm water runoff, but they cannot set stricter flow rate requirements than what already existed on the land before construction started. These rules also allow for certain regulations regarding how water flows from neighboring properties into a construction site. (Todavía no está traducido al español.)1

Lea la explicación oficial (en inglés)

This bill relates to the regulation of topsoil and storm water at construction sites. The bill prohibits a county or city from adopting or enforcing an ordinance, motion, resolution, or amendment relating to the preservation, compaction, placement, or depth of topsoil at a construction site. The bill authorizes a county or city to adopt or enforce an ordinance, motion, resolution, or amendment that regulates storm water runoff at a construction site only to the extent that such regulation does not require a post-construction storm water flow rate that is more restrictive than the existing flow rate of the same storm event, with all such runoff rates based on the actual existing condition of the site at the time the construction commences. Additionally, a county or city may adopt or enforce an ordinance, motion, resolution, or amendment that regulates storm water runoff from upstream properties adjacent to a construction site only to the extent that storm water runoff shall be allowed to pass through downstream storm water basins at the same flow rate as off-site storm water runoff entering the construction site.

Cambiado después por las enmiendas H-8162, H-8004, S-3074; vea Enmiendas.

Texto completo del proyecto (en inglés) · Qué cambió antes de aprobarse2

House subcommittee

Named January 10, 2024. On January 17, 2024 it recommended passage. Vote Total: 2-1.

Three legislators hear a bill first and recommend what the committee should do; it’s the best time to weigh in. How to take part

2 comentarios públicos por escrito a su subcomité: 23 de marzo de 2023 (1), 27 de febrero de 2023 (1) · en el sitio de la Legislatura

Nota fiscal

Can’t be estimated Compare con otros proyectos

Resumen con IA This bill limits how cities and counties can regulate topsoil and storm water runoff at construction sites. The Department of Natural Resources estimates the bill will cost approximately $1.7 million and require 8.0 new full-time equivalent inspector positions in fiscal year 2025. This includes a total ongoing cost of $1.2 million per year for salaries and a one-time cost of approximately $520,000 for equipment and other expenses in fiscal year 2025, while the fiscal impact on counties and cities cannot be estimated. (en inglés)3

Lea la nota fiscal (en inglés)

Description

Senate File 455 relates to local regulation of topsoil and storm water at construction sites. Provisions in the Bill include:

  • Defining “construction site” to mean a site or common plan of residential or commercial development, including a single-unit or multiple-unit residential building.
  • Defining “topsoil” as the same as defined in the National Pollutant Discharge Elimination System (NPDES) General Permit Number (No.) 2 as issued by the Department of Natural Resources (DNR).
  • Prohibiting a county or city from adopting or enforcing an ordinance, resolution, or amendment regarding topsoil at a construction site that is more restrictive than those requirements provided in NPDES General Permit No. 2.
  • Allowing a county or city to adopt or enforce an ordinance, motion, resolution, or amendment that regulates storm water runoff at a construction site for 5- to 100-year rainfall events only if the storm water flow rate is not more restrictive than the existing flow rate of a 5-year rainfall event, with all runoff rates based on site conditions at the time construction commences.
  • Allowing a county or city to adopt or enforce an ordinance, motion, resolution, or amendment that regulates storm water runoff from upstream properties adjacent to a construction site if the runoff is allowed to pass through downstream storm water basins at the same flow rates as off-site storm water runoff entering the construction site.
  • Allowing a county or city to impose storm water runoff requirements that are more restrictive than what is allowed or required by the DNR if the county or city pays for all study, design, and engineering costs associated with implementing the storm water runoff requirement; pays for one-half of any equipment or practices required for a property owner to comply with the requirement; pays the property owner the fair market value of any property or easement taken to impose the requirement; and pays the costs incurred without imposing a special assessment or otherwise recovering the costs solely from the property owner for the costs attributable to the county or city.
  • Allowing a county or city to impose a storm water runoff requirement that is more restrictive than established in federal or State law if the county or city and the owner of the affected property agree to the requirement.
  • Allowing a county or city to request that the DNR review the soil of a construction site to verify whether a NPDES General Permit No. 2 is appropriate for the site.

Background

Iowa Code sections 331.301 and 364.3, which are amended in the Bill, outline the general powers and limitations of county and city governments, respectively.

The DNR’s NPDES General Permits allow the DNR to allocate resources efficiently to provide timely permit coverage for multiple facilities in a permit application and allow for consistency. The DNR’s NPDES General Permit No. 2 relates specifically to storm water related to construction activities.

Assumptions

  • The expenditure requirements in the Bill are voluntary. However, at least one county or city will establish storm water requirements that will require local government expenditures for study, design, or engineering costs; equipment or practices; or property, as outlined in the Bill.
  • The costs to a county or city for creating storm water requirements that are more restrictive than what is allowed or required by the DNR cannot be determined and will vary depending on individual circumstances.
  • There will be approximately 900 inspections of construction sites conducted by the DNR.
  • The DNR will require new full-time equivalent (FTE) positions to complete these inspections. The salary and benefits for one inspector will be $150,000 per year.
  • There will be one-time equipment costs including vehicles, clothing, and computers associated with the new inspector FTE positions.

Fiscal Impact

The fiscal impact of the Bill to counties and cities cannot be estimated as it is unknown how many studies would be needed and it is unknown how many counties or cities would create more restrictive storm water requirements.

The DNR estimates that SF 455 will require approximately $1.7 million and 8.0 new FTE positions for inspectors in FY 2025 to conduct the inspections of construction sites requested by cities and counties. This would include a total ongoing cost of $1.2 million per year for salaries and a total one-time cost of approximately $520,000 for equipment and other operational expenses for FY 2025.

Sources

  • Department of Natural Resources
  • Iowa State Association of Counties
  • Legislative Services Agency

Cómo leer una nota fiscal4

Lo que cambia del Código de Iowa (Iowa Code)

Modifica§331.301§364.3

Cómo funciona el Código5

Cabildeo

4 a favor · 21 en contra · 13 indecisos · Quiénes →

Family tree

Tried before

This idea has been filed in an earlier General Assembly. None got through a chamber.

  • HSB 536 HSB 536
    89th General Assembly · In committee · similar
    Cleared committee

Matched by wording or an identical title.