Proyectos de ley › 90.ª Asamblea General
Providing for the removal of effluent from certain structures
Presentado por el comité Natural Resources and Environment del Senado
Temas:AgricultureEnvironment & natural resourcesLivestock & confinements
Dónde está ahora
- Hecho: Presentado6 de febrero de 2024
- Hecho: Subcomité6 de febrero de 2024
- Hecho: Comité del Senado13 de febrero de 2024
- Se detuvo: Lo aprueba el SenadoMurió al terminar la Asamblea General
- Sigue: Comité de la Cámara
- Sigue: Lo aprueba la Cámara
- Sigue: A gobernador(a)
- Sigue: Firmado como ley
Murió al terminar la sesión La sesión de 2024 terminó el 19 de abril de 2024, la última sesión ordinaria de la Asamblea General. Los proyectos que no pasaron por ambas cámaras murieron. ¿Qué es el embudo (funnel)?
Qué contiene
Resumen con IA People running open feedlots or animal truck wash facilities can now remove waste from storage structures even if their nutrient management plan hasn't been approved yet. To do this, they must submit a complete plan to the Department of Natural Resources and notify them before applying the waste. The removal must also be necessary to prevent water quality violations and follow all existing rules for applying waste. (Todavía no está traducido al español.)1
Lea la explicación oficial (en inglés)
BACKGROUND.102). An open feedlot operation (operation) is an unroofed or partially roofed area.112). The Code chapter also regulates an animal truck wash facility (facility) that engages in washing certain trucks transporting agricultural animals (cattle, swine, horses, sheep, chickens, turkeys, or fish) and collecting, storing, and applying the resulting animal effluent. In both cases, the effluent is stored in a structure.102).312. An NMP refers to the original, complete document or the next complete version of the document subject to DNR approval. It may also refer to an annual update to the complete document as required by DNR. An NMP and update must be kept on site as part of the owner’s records. An NMP estimates effluent volume or weight produced from the operation and addresses agronomic rates of application in part based on nitrogen use and a phosphorus index.208). BILL’S PROVISIONS.208). In order to remove the effluent from a structure, the person must comply with four conditions. First, the removal must be necessary to prevent a violation of a water quality standard; second, the person must submit a complete NMP to DNR prior to the removal; third, the removed effluent must be applied according to requirements in the Code chapter, including DNR rules; and fourth, DNR must be notified prior to the application.
Por qué importa. Owners of open feedlot operations or animal truck wash facilities could remove effluent from storage structures before their nutrient management plan is approved if the removal is necessary to prevent a water quality violation. To do this, the owner must submit a complete plan to the Department of Natural Resources, notify the department before applying the effluent, and follow all existing rules for applying the material. (Todavía no está traducido al español.)2
Senate subcommittee
Named February 6, 2024 (as SSB 3152). On February 12, 2024 it recommended amendment and passage. [].
Three legislators hear a bill first and recommend what the committee should do; it’s the best time to weigh in. How to take part
Lo que cambia del Código de Iowa (Iowa Code)
Modifica§459A.208
Cabildeo
0 a favor · 6 en contra · 12 indecisos · Quiénes →
Family tree
90th General Assembly