Back to the bill

90th General Assembly · Funnel one-pager · Monday, November 9, 2026

SF 245: Relating to positive train control systems, and making penalties applicable

Died when the session ended · The General Assembly adjourned on April 19, 2024. Bills that didn’t pass both chambers died.

What it does

236). This bill requires every class I and class II railroad corporation to ensure the railroad upon which the corporation’s trains operate and every train controlled by the corporation, including trains controlled by an agent of the corporation, is equipped with and makes use of a PTC system. A railroad corporation is responsible for all costs associated with the installation and maintenance of the PTC system. A PTC system is designed to prevent railroad train-to-train collisions, over-speed derailments, incursions into established work zones, and movements of railroad trains through switches left in the wrong position.

Sponsors

Not listed

Cost

No fiscal note

Senate subcommittee · named February 23, 2023

  • Sen. Tom Shipley (R) · tom.shipley@legis.iowa.gov
  • Sen. Claire Celsi (D)
  • Sen. Dan Zumbach (R) · dan.zumbach@legis.iowa.gov

Lobbying · 2 for, 3 against

For: Brotherhood of Locomotive Engineers and Trainmen; SMART-Transportation Division

Against: BNSF Railway Co.; CN Rail; Union Pacific Railroad

In plain words

  1. February 8, 2023Filed in the Senate and sent to the Transportation committee
  2. February 15, 2023Senate subcommittee named: Shipley, Webster and Winckler
  3. February 21, 2023Senate subcommittee named: Shipley, Celsi and Webster
  4. February 23, 2023Senate subcommittee named: Shipley, Celsi and Zumbach
  5. February 23, 2023Subcommittee recommended passing it

From public records at legis.iowa.gov, compiled by Funnel (iowafunnel.com), an independent, nonpartisan site. Current as of Monday, November 9, 2026. https://iowafunnel.com/bills/90/SF245